Retrospective planning permission
Planning permission is the legal process followed in order to decide whether proposed developments should be allowed to go ahead. Responsibility for planning permissions lies with local planning authorities (usually, the planning department of the district or borough council).
Other than permitted developments, (which are considered to have insignificant impact), all developments require planning permission.
It is possible to apply for retrospective planning permission after works have begun. The local planning authority will then consider the application in the same way that they would any other application. Retrospective permission may be granted, however, there is a very serious risk that permission will not be granted and then enforcement action may be taken. This could include modifying completed works, or returning the development to its previous ‘permitted’ state. Appeals can be made to the planning inspectorate.
Planning enforcement is the process of investigating and resolving possible breaches of planning law. Breaches might include:
- Not obtaining planning permission for works that require permission (including; listed buildings, satellite dishes, advertisements, protected trees and so on).
- Not carrying out works in accordance with a permission.
- Not complying with planning conditions or other limitations.
- Changing the use of a site or buildings without obtaining planning permission where planning permission is required.
Local planning authorities have discretionary power to investigate and enforce these breaches using whatever enforcement action may be necessary in the public interest. One possible enforcement action is to ask the party in breach to make a retrospective planning application if they have not already done so. However, permission may still then be refused.
On 6 April 2012, the Localism Act 2011 made changes to planning enforcement to tackle abuse of retrospective planning applications:
- Planning authorities can decline to determine retrospective applications after an enforcement notice has been issued.
- Limits have been introduced to the right of appeal against an enforcement notice after a retrospective planning application has been submitted, but before the time for making a decision has expired.
- Limiting appeals on technical grounds resulting in the granting of planning consent.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Avoiding planning permission pitfalls.
- Listed buildings.
- Localism Act.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning appeal.
- Planning authority.
- Planning conditions.
- Planning enforcement.
- Planning obligations.
- Planning permission.
- Regularisation.
[edit] External references.
- House of Commons Library, Enforcement of Planning Law. 16 July 2013.
Featured articles and news
OpenUSD possibilities: Look before you leap
Being ready for the OpenUSD solutions set to transform architecture and design.
Global Asbestos Awareness Week 2025
Highlighting the continuing threat to trades persons.
Retrofit of Buildings, a CIOB Technical Publication
Now available in Arabic and Chinese aswell as English.
The context, schemes, standards, roles and relevance of the Building Safety Act.
Retrofit 25 – What's Stopping Us?
Exhibition Opens at The Building Centre.
Types of work to existing buildings
A simple circular economy wiki breakdown with further links.
A threat to the creativity that makes London special.
How can digital twins boost profitability within construction?
The smart construction dashboard, as-built data and site changes forming an accurate digital twin.
Unlocking surplus public defence land and more to speed up the delivery of housing.
The Planning and Infrastructure Bill
An outline of the bill with a mix of reactions on potential impacts from IHBC, CIEEM, CIC, ACE and EIC.
Farnborough College Unveils its Half-house for Sustainable Construction Training.
Spring Statement 2025 with reactions from industry
Confirming previously announced funding, and welfare changes amid adjusted growth forecast.
Scottish Government responds to Grenfell report
As fund for unsafe cladding assessments is launched.
CLC and BSR process map for HRB approvals
One of the initial outputs of their weekly BSR meetings.
Building Safety Levy technical consultation response
Details of the planned levy now due in 2026.
Great British Energy install solar on school and NHS sites
200 schools and 200 NHS sites to get solar systems, as first project of the newly formed government initiative.
600 million for 60,000 more skilled construction workers
Announced by Treasury ahead of the Spring Statement.