Retrospective planning permission
Planning permission is the legal process followed in order to decide whether proposed developments should be allowed to go ahead. Responsibility for planning permissions lies with local planning authorities (usually, the planning department of the district or borough council).
Other than permitted developments, (which are considered to have insignificant impact), all developments require planning permission.
It is possible to apply for retrospective planning permission after works have begun. The local planning authority will then consider the application in the same way that they would any other application. Retrospective permission may be granted, however, there is a very serious risk that permission will not be granted and then enforcement action may be taken. This could include modifying completed works, or returning the development to its previous ‘permitted’ state. Appeals can be made to the planning inspectorate.
Planning enforcement is the process of investigating and resolving possible breaches of planning law. Breaches might include:
- Not obtaining planning permission for works that require permission (including; listed buildings, satellite dishes, advertisements, protected trees and so on).
- Not carrying out works in accordance with a permission.
- Not complying with planning conditions or other limitations.
- Changing the use of a site or buildings without obtaining planning permission where planning permission is required.
Local planning authorities have discretionary power to investigate and enforce these breaches using whatever enforcement action may be necessary in the public interest. One possible enforcement action is to ask the party in breach to make a retrospective planning application if they have not already done so. However, permission may still then be refused.
On 6 April 2012, the Localism Act 2011 made changes to planning enforcement to tackle abuse of retrospective planning applications:
- Planning authorities can decline to determine retrospective applications after an enforcement notice has been issued.
- Limits have been introduced to the right of appeal against an enforcement notice after a retrospective planning application has been submitted, but before the time for making a decision has expired.
- Limiting appeals on technical grounds resulting in the granting of planning consent.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
- Avoiding planning permission pitfalls.
- Listed buildings.
- Localism Act.
- National Planning Policy Framework.
- National Planning Practice Guidance.
- Permitted development.
- Planning appeal.
- Planning authority.
- Planning conditions.
- Planning enforcement.
- Planning obligations.
- Planning permission.
- Regularisation.
[edit] External references.
- House of Commons Library, Enforcement of Planning Law. 16 July 2013.
Featured articles and news
Shortage of high-quality data threatening the AI boom
And other fundamental issues highlighted by the Open Data Institute.
Data centres top the list of growth opportunities
In robust, yet heterogenous world BACS market.
Increased funding for BSR announced
Within plans for next generation of new towns.
New Towns Taskforce interim policy statement
With initial reactions to the 6 month policy update.
Heritage, industry and slavery
Interpretation must tell the story accurately.
PM announces Building safety and fire move to MHCLG
Following recommendations of the Grenfell Inquiry report.
Conserving the ruins of a great Elizabethan country house.
BSRIA European air conditioning market update 2024
Highs, lows and discrepancy rates in the annual demand.
50 years celebrating the ECA Apprenticeship Awards
As SMEs say the 10 years of the Apprenticeship Levy has failed them.
Nominations sought for CIOB awards
Celebrating construction excellence in Ireland and Northern Ireland.
EPC consultation in context: NCM, SAP, SBEM and HEM
One week to respond to the consultation on reforms to the Energy Performance of Buildings framework.
CIAT Celebrates 60 years of Architectural Technology
Find out more #CIAT60 social media takeover.
The BPF urges Chancellor for additional BSR resources
To remove barriers and bottlenecks which delay projects.
Flexibility over requirements to boost apprentice numbers
English, maths and minimumun duration requirements reduced for a 10,000 gain.
A long term view on European heating markets
BSRIA HVAC 2032 Study.
Humidity resilience strategies for home design
Frequency of extreme humidity events is increasing.
National Apprenticeship Week 2025
Skills for life : 10-16 February